Please use the below links to drop down to specific pieces of information:
- Background and project purpose
- Project details
- In case you missed it: Feb. 22 virtual public meeting
- Map of project area
- Project designs (conceptual)
- Schedule
- Funding
- Resources to learn more
- How to request translated materials
Background and project purpose
Green Lake is one of Seattle’s most beloved parks. Its expanse of water and green space in the center of a dense urban neighborhood draws thousands of people daily from all over the city and region.
When complete, the Green Lake Outer Loop project will provide a better-connected loop path around the outside of Green Lake Park. This means safer, more comfortable travel options for people walking, running, biking, and rolling, as well as connections to surrounding neighborhoods in the area.
These improvements are based on community feedback, our Vision Zero safety goals, and our work to provide more low-carbon travel options. The proposed improvements also build on two recently completed projects in the area: the Green Lake and Wallingford Multimodal Paving Project and the new shared use walking and biking path on W Green Lake Way N.
Project details
Our proposed plan is to convert one of the three northbound lanes of Aurora Ave N alongside the park into a 0.4 mile long protected bike lane. The northbound lane conversion on Aurora Ave N (shown in the map below as “Segment 1”) would be in the area where there is an existing gap in northbound bus lanes on Aurora Ave N (between N 63rd St and W Green Lake Dr N).
The completed project would not close any roads to cars. Vehicle access will not be changed on W Green Lake Way N on the southern side of the park, and cars will still be able to drive from Stone Way N to the Phinney Ridge side of Aurora Ave N, or use the northbound on-ramp to Aurora Ave N.
Over the past few months, we have been collecting community feedback on designs for the Aurora Ave N and W Green Lake Dr N segments of this project. Based on what we’ve heard, we can now move forward with the preferred project designs on both project segments.
We will continue to coordinate with Seattle Parks and Recreation as it relates to Green Lake’s inner loop trail, while we continue to move forward with planning, design, and construction for the outer loop improvements described in this blog.
In Case You Missed It: Feb. 22 virtual public meeting
- We’ve posted the presentation and materials from an public meeting held on Tuesday, February 22.
- Thank you again to everyone who attended this meeting! We appreciate your ongoing engagement, questions, and feedback.
- You can also view our summary of community feedback from a public survey held in November 2021. The survey summary is available here.
Map of project area
Project designs (conceptual)
Segment 1: Aurora Ave N
Segment 2: W Green Lake Dr N
Schedule
- Fall 2021: Initial outreach and community engagement for Aurora Ave N and W Green Lake Dr N segments (complete)
- Winter–Spring 2022:
- Collect traffic data
- Continue public engagement
- Identify project funding sources
- Continue to share project updates as new information becomes available
- Summer/Fall 2022: Construction could begin as early as mid-2022
Funding
- We have recently identified construction and design funding for this project through our Vision Zero Program, which prioritized this project due to its safety benefits and potential to address recent collisions that have occurred in this area.
Resources to learn more
- Web page: Green Lake Outer Loop
- Frequently Asked Questions: FAQs handout (PDF)
- Phone: (206) 900-8760
- Email us: GreenLakeOuterLoop@Seattle.gov
- Subscribe to email updates: Sign up here
If you need this information translated, please call (206) 900-8760.
- 如果您需要此信息翻譯成中文 請致電 (206) 900-8760.
- Servicios de traducción e interpretación disponibles bajo petición (206) 900-8760.
- Matutulungan ka naming maintindihan kung hihingi kang tulong (206) 900-8760.
- 요청하시면 번역이나 통역을 제공해드립니다 (206) 900-8760.
- Dịch và thông dịch viên sẵn sàng nếu có sự yêu cầu (206) 900-8760.
- Haddii aad dooneyso turjubeen fadlen wac (206) 900-8760.
Thank you for your interest in the Green Lake Outer Loop project! We encourage you to stay tuned for additional updates by visiting our website or subscribing for project email updates.
Politics
TDPel Media
This article was published on TDPel Media. Thanks for reading!
Share on Facebook «||» Share on Twitter «||» Share on Reddit «||» Share on LinkedIn